An operations portal for a language services company
Clients, suppliers, projects and quotes, pricing by tasks and languages, workspaces, permissions by role, client review, alerts and a link to the editor.
We map the process, build the system that fits it and put it to work.
A system built around how the company actually works: from process mapping and specification, through build and integrations, to a rollout the team actually uses. AI is a capability inside it, not the service.
The data exists, but nobody sees in real time what is moving, what is stuck, what was sold, what was done and what is about to break. At one company the information on execution, prices, technicians and collection was not connected; at another, field progress was updated only at month end; and a manager of a company too big to run "from the head" needed a KPI dashboard to understand where the business is going.
"where is the business going?"A request arrives by email or WhatsApp, someone copies it into Excel or a system, another prepares a document, a third checks, a fourth sends. Every hand-off brings duplication, mistakes, lost context and no clear ownership.
"every hand-off brings duplication"The system can be expensive, heavy or built around a model that does not fit the company. It covers part of the work, but not the real flow; the staff manage the exceptions outside it and go back to Excel and WhatsApp.
"back to Excel and WhatsApp"The owner holds the context in their head, the project manager holds the update, the finance person holds collection, and the supplier or the field worker hold the photos and the real state. There is no one place where everyone sees the right version, the one relevant to them.
"no one place"Photos and videos are sent on WhatsApp and saved by hand to Drive; project managers report late; stock is counted by hand; progress is documented after the fact. It needs a simple interface from the phone, not another system staff have to learn like tech people.
"not another system to learn"Collection runs on spreadsheets, emails and phone calls. Quotes are delayed. It is hard to know whether a full day of work was profitable. Quantity calculations and pricing take hours of manual work, and sometimes one experienced person is the bottleneck.
"whether a full day was profitable"Live systems have many roles, permissions, statuses, entities, clients and suppliers. Without someone holding the model and the flow, you get missing screens, undefined exceptions, UX that does not match the spec, and development moving without a shared picture.
"without a shared picture"We do not start from "let's build a system". We start from one or two processes where real value can be seen, then expand.
Clients, suppliers, projects and quotes, pricing by tasks and languages, workspaces, permissions by role, client review, alerts and a link to the editor.
Data collected from Excel, WhatsApp, work logs and existing systems; KPIs by role; execution, pricing, technicians and collection connected; alerts and a picture of the situation for management.
The examples are directions, not a catalogue of ready products. Every system starts from the company's work and the decisions it needs to make.
We sit with the people who do the work; when needed, we come to the office or the field and watch the process happen.
One to three processes with pain, volume and a measurable change.
Flows, data, permissions and UX defined; building and fixing in parallel, not waiting for a perfect document.
Testing with the team, fixing, training, and expanding only once the system is useful.
Projects go live within six weeks to six months, depending on requirements, scope and complexity.
Operations portal · clients, suppliers and quotes · anonymous
The work had outgrown the systems. Clients, suppliers, projects and quotes were run across several tools at once, and the same information was copied between them by hand.
The first question was not what to build but whether to build at all. After mapping the process the decision was to build, in stages, around the team's real workflow rather than around a general model.
An ERP and off-the-shelf tools are built around a general model, and the company adapts to it. A custom system is built around your flow, exceptions included, and connects to what you already have. You do not have to replace anything: usually we start beside the existing system, build the flow it does not hold and connect to it. It gets replaced only when it is itself the problem, and then in stages. When an off-the-shelf product covers the process, buying it is the better choice.
Yes, that is how it always starts: one to three processes with pain, volume and a measurable change. We build and fix in parallel, without waiting for a perfect document, so a first pilot is measured in weeks rather than months, depending on the process chosen and on your availability for questions. Expansion comes only once it works in practice.
Yes. They stay where they work, and the system connects to them: takes from them, organises, and gives back one place where the situation can be seen. The same goes for the accounting system, the ERP and internal tools.
That is the working assumption, not a problem: a simple interface from the phone, one screen per role, and no screens that are not needed. Where the work happens in the field there is mobile, for execution updates, photos and videos inside the project and stock counts, with no app to install. If the team does not use it, the system is not finished.
Yes, as a step inside a defined process: reading a contract, extracting quantities from a PDF plan, classifying a photo from the field, flagging an exception. AI is a layer inside the system rather than a separate service, and always with a person responsible for the result.
You, together with me, during mapping: what management needs to see in order to decide and what each role needs in order to work, not a generic list of metrics. After going live comes rollout: testing with the team, fixing, training, and expanding to the next process only once the system is useful. Then ongoing maintenance, or your team carries on alone.
If the work has outgrown the systems, let us map one process in 30 minutes.